DXB Wholesale Trading LLCDubai · UAE

Philips

Philips Upgrade Kit 12-15/16 long leads IEC

Diagnostic cardiology line · Patient Application Child; Adult · Application Site Limb; Chest · Philips reference HC989803151781

SKU:
PHI-HC989803151781
Available to order
Sold in cartons of 1
ShieldedShielded
CE CertifiedYes
Color CodingIEC
Product TypeDiagnostic ECG Patient Cables and Leads
Packaging Unit1
Lead Set Length48 in (1.22m)
Number of Leads16
Application SiteLimb; Chest
Product CategoryECG
Minimum Shelf LifeNone
Patient ApplicationChild; Adult
Sterile OR Non-SterileNon-Sterile
Use with Other SuppliesN/A
Electrode Attachment MethodAlligator Clip
Use with Philips Healthcare Equipment860315, 860310
Single-Patient Use OR Multi-Patient UseMulti-Patient Use
Use with Non-Philips Healthcare EquipmentNo
Not manufactured with natural rubber latexYes

More from Philips